| no |
road no |
Roade section
|
Total
(km) |
Asphalt
(km)
|
Pavement cubes
(km) |
Macadam
(km) |
Earth
(km) |
Without alignment
(km) |
Motorway
(km) |
E-road
(km) |
odbieno prekl.
so pat(km) |
| 1 |
2 |
3 |
3=4÷8 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
| 1 |
M2k1 |
Connectio with M2 - Clecevce |
5.560 |
5.531 |
|
0,029 |
|
|
|
|
|
| 2 |
M3k1 |
Connection with M3 (пред наплатник за пруга кај Momin Potok) - brick factory-
crosroad on the st. Bosni and Hercegovina, "Croatia" и
"Hristian Todorovski-Karpos " - Smilkovci - Cresovo |
10.622 |
8.804 |
|
|
|
1.818 |
|
|
|
| 3 |
M4k1 |
Connection withM4 - Kamenjane |
1.890 |
1.890 |
|
|
|
|
|
|
|
| 4 |
M4k2 |
Connection with M4 - Negotino (Polosko) |
3.890 |
3.890 |
|
|
|
|
|
|
|
| 5 |
M4k3 |
Connection with M4 - Vrapciste |
4.635 |
4.635 |
|
|
|
|
|
|
|
| 6 |
M4k4 |
Connection with M4 - Vrutok |
4.935 |
1.041 |
3.894 |
|
|
|
|
|
|
| 7 |
M4k5 |
Connection with M4nort - Zajas - connection withM4 south |
3.533 |
3.533 |
|
|
|
|
|
|
|
| 8 |
M4k6 |
Connection with M4 (Botun) -Belcista |
4.000 |
4.000 |
|
|
|
|
|
|
|
| 9 |
M5k2 |
Connection with M5 -Topolcani |
0,690 |
0,638 |
0,052 |
|
|
|
|
|
|
| 10 |
M5k3 |
Connection with M5 -Cesinovo |
1.480 |
1.480 |
|
|
|
|
|
|
|
| 11 |
M5k4 |
Connection with M5 -Orizari |
2.580 |
2.548 |
|
0,032 |
|
|
|
|
|
| 12 |
M6k1 |
Connection with M6 - Vasilevo |
0,740 |
0,740 |
|
|
|
|
|
|
|
| |
|
TOTAL REGIONAL BRANCH LINES OF NATIONAL ROADS |
44.555 |
38.730 |
3.946 |
0,061 |
|
1.818 |
|
|
|
|
|
|